商鋪名稱:上海心雨機電設備有限公司
聯系人:閆經理(小姐)
聯系手機:
固定電話:
企業郵箱:395717253@qq.com
聯系地址:上海市嘉定區德富路1211號205室
郵編:210000
聯系我時,請說是在焊材網上看到的,謝謝!
0811404455現貨
0811404710現貨
0811404041現貨The final report is delivered as a printed copy, with accompanying data on a CD. Cracks and crack-like data are prioritized by severity for convenient assessment by the pipeline operator.
0831006003現貨
0811404035現貨
0811404026現貨
0811404603現貨
0811404553現貨所有測量和處理任務都在一個軟件工具和集成化的硬件平臺上完成.
0831006030現貨
0811404020現貨
0811404742現貨
0831006057現貨
0811404618現貨
0811404304現貨
0811404034現貨
0811404221現貨
0811404658現貨
0811404141現貨
0811404100現貨 “General Electric has an impressive history and a strong
reputation as a technology company. At the same time, StatoilHydro
has developed and been a brave user of a number of innovative
technologies and solutions. By cooperating with concrete technology
development projects within certain areas, we believe we will
mutually benefit. We also intend to share experience within
R&D, Innovation and HR practices. This will hopefully stimulate
and assist both companies to further improve our ways of doing
technology development”, says Margareth Øvrum,
Executive Vice President for Technology and New Energy in StatoilHydro.
0811404553現貨
0811006030現貨
[FILE3]
0811404634現貨
0811404742現貨
0831006057現貨
0811404300現貨
0811404551現貨
0811404086現貨
0811404409現貨
0811404132現貨Recently, GE Oil & Gas completed tests on the highest pressure sour gas re-injection train ever built, which is scheduled for installation at the Kashagan oil field of the North Caspian Sea, off the coast of Kazakhstan. Based on well-proven re-injection train architecture that incorporates a GE Frame 5-2D gas turbine and three BCL centrifugal compressors, the turbo-compression train reached 820 bar pressure during full density tests, topping the former record of 690 bar, also achieved by GE technology.
0811404304現貨
0811404315現貨
0811404656現貨
0811404140現貨