風電基礎模板,風力發電基礎底座模具是由直徑18米到22米左右不等的直徑底座模板組裝而成的,風電基礎模板分為上下模板,上模的尺寸一般都是6到9米不等的,模板的高度更是不等的,風電基礎模板的尺寸都比較大所以分為很多塊模板組裝而成,由一塊一塊螺絲連接而成,最后組裝好了由外部鋼絲繩加固結實了就可以開始施工澆筑了,風力發電基礎模板。
風力發電基礎鋼模板脫模時,首先要拆除的是這些特定設施。特定設施主要為拉桿。首先拔出拉桿,然后拆下螺釘等大部件。但是拆模的時候,因為這個模板的尺寸很小,我可以用叉車配合拆模。脫模之后得到擋渣墻模板產品。但是,在脫模開始時,混凝土產品僅處于初凝狀態,因此我們必須進行一段時間的維護。養護時間不宜少于7天,否則混凝土制品極不易開裂。在養護前夕,通常都進行澆水養護,無論在什么季節和天氣,在維修前夕,現澆風電基礎模具,混凝土風機底座鋼模板應始終得到保證;現澆風電基礎模具,混凝土風機底座鋼模板;天氣炎熱時,為保證濕度,應增加澆水次數,以保證產品質量,在具體使用之中更輕巧。
Wind power foundation template: the wind power foundation base template is assembled from the base template with a diameter ranging from 18 meters to 22 meters. The wind power foundation template is divided into upper and lower templates. The size of the upper template is generally 6 to 9 meters, and the height of the template is different. The size of the wind power foundation template is relatively large, so it is assembled into many templates, It is connected by screws one by one. Finally, when it is assembled and reinforced by external steel wire rope, the construction and pouring can be started. The wind power generation foundation formwork.
When demoulding the steel formwork of wind power foundation, the first thing to be removed is these specific facilities. Specific facilities are mainly tie rods. First pull out the pull rod, and then remove large parts such as screws. However, when removing the formwork, because the size of the formwork is very small, I can use a forklift to remove the formwork. After demoulding, the slag retaining wall formwork product is obtained. However, at the beginning of demoulding, the concrete product is only in the initial setting state, so we must carry out maintenance for a period of time. The curing time shall not be less than 7 days, otherwise the concrete products are not easy to crack. On the eve of maintenance, watering maintenance is usually carried out. No matter what season and weather, on the eve of maintenance, the cast-in-situ wind power foundation mold and concrete fan base steel formwork shall always be guaranteed; Cast in situ wind power foundation mould, concrete fan base steel formwork; When the weather is hot, in order to ensure the humidity, the watering times should be increased to ensure the product quality and make it lighter in specific use.